Sweet Spot Part 1 | Power | 4 weeks

£19.99

This plan is designed to develop your threshold in the base season by working at Sweet spot intensity which is around 88-93% of FTP. It is based on 4 sessions per week with a mixture of turbo trainer and road. Most of the sessions have been constructed using power although this can be done using HR zones also. There is also some strength & conditioning sessions to be completed off the bike which is also important to develop you as a cyclist.

Device Required

Power

Plan Duration

Short

Plan Goal

Increase FTP

Weekly Volume

Low, Medium

SKU: TP002 Category:

Description

This plan is designed to develop your threshold in the base season by working at Sweet spot intensity which is around 88-93% of FTP. It is based on 4 sessions per week with a mixture of turbo trainer and road. Most of the sessions have been constructed using power although this can be done using HR zones also. There is also some strength & conditioning sessions to be completed off the bike which is also important  to develop you as a cyclist.

Additional information

Device Required

Power

Plan Duration

Short

Plan Goal

Increase FTP

Weekly Volume

Low, Medium